Bridge repair spring 2023


We have a photo to follow up Temple Cummins’ status report at the Annual Meeting. The middle section of the bridge was replaced April 22 after one of the logs rotted out. A new log was floated into place and four foot wide rough cut cedar laid on top. With the wider planks it’s much easier to navigate around the alders. Water level in the lagoon is still very high, but when it lowers a bit the trail crew can place supports under the bridge to minimize the bouncing when walking on it.

Thanks go to Temple, his son Cannon, and Bernie for maintaining the bridges!