Bridge Repair

We have a photo to follow up Temple Cummins' status report at the Annual Meeting. The middle section of the bridge was replaced April 22 after one of the logs rotted out. A new log was floated into place and four foot wide rough cut cedar laid on top. With the wider planks it's much … Continue reading Bridge Repair